Busy Day
Today I worked on the landing floor, hall floor and stairs.
Pulled up the carpet off the stairs and landing, lifted the laminate floor from the hall.
Laid a pipe from under the front door to under the electric cupboard.
Spent a long time getting up gripper rod and pulling nails and staples out of the floor that have been used to fasten down underlay and linoleum.
All the rubbish is in the back of the car ready to go to the tip tomorrow.
Did I mention it's been a very hot day too?
❤️0
Tags:Decorating, Hall, Stairs, Landing
This update was first written by Darren Wall
on Saturday 13th Aug 2022.
Privacy : public
